Volunteer's Accomplished Projects

Map For Entrance Sign
Some of the volunteers who built the platform for the Railroad sign on the Laurel Woods Trail.
Map For Entrance Sign
May 2010, two benches were built and then installed in the Laurel Woods Trail. One located in the middle of the trail, the other on the south end near the railroad cut.
Map For Entrance Sign
More than 100 bags of trash were collected during April 10th and April 17th of 2010 by a Friends of the Trails volunteers. There's more! Judging from the condition of the trash (mostly bottles and cans) and large refuse this stretch of Penn Green Road along the Laurel Woods Trail has been a dumping and tossing point for trash from passing motorist for several decades.
Map For Entrance Sign
The road signage for the Laurel Woods Trail was erected on April 17th. This represents the first sign for the planned expansion of other trails to be constructed in New Garden.
LWT bridege
A view of the bridge construction on the Laurel Woods Trail to cross a deep gully from previous stormwater erosion. The tireless team of a dozen volunteers using donated equipment and with supplies from the Dockstater Foundation assembled the sturdy structure during the weekends in the summer of 2009.